Field Development of 37 production wells, 31 water injectors, 3 gas injectors tied back to a FPSO (Floating Production, Storage and Offloading) vessel.
Off the coast of Angola
1.1 Billion USD
Construction of the first 2 LNG trains to have been built in over 40 years in North America.
Cameron, Louisiana
5.9 Billion USD
Added 325 MBD to the existing refinery to become the largest US refinery at 600 MBD. Includes a Delayed Coker, Hyrocracker Unit, Naptha Processing Complex & Cat Feed Hydrotreater.
Port Arthur, Texas
10+ Billion USD
Increase the capacity to handle heavy crude from Canada's oil sands. The project included a four-drum Coker Unit, Vacuum Flasher, Hydrogen Plant, and 2 Sulfur Recovery Units.
Wood River, Illinois
3.8 Billion USD
Oil Spill Response in the Gulf of Mexico including Containment, Source Control, and Relief Wells. Creation of the Gulf Coast Restoration Organization (GCRO)
Gulf Coast States of Florida, Alabama, Mississippi, Louisiana, and Texas
60+ Billion USD
NCMA is a four-phased development project designed to supply LNG to markets in the United States, Spain and the Dominican Republic. Other projects included Block 5C and DEC3.
Off the cost of Trinidad
1+ Billion USD